Façade Refinishing & Long-Term Protection

WRNZ was engaged by Symonite to carry out a large-scale ACM refinishing project for the prestigious Pullman Hotel at Auckland Airport. Over 450 ACM panels were refinished off-site in a controlled environment to ensure precision, durability, and flawless colour matching.

Project Overview

  • Client: Symonite
  • Location: Auckland Airport
  • Type: Off-Site ACM Panel Refinishing
  • Completed: 2023

Scope of Work

  • Precise colour matching to factory-finished ACM panels
  • Application of PPG 719 Poly-etch primer
  • Delfleet 417 Line Topcoat for durability
  • Off-site controlled refinishing process

Challenges

  • High-exposure airport environment required coatings with maximum resistance
  • Long-term UV and corrosion protection ensured through specialist systems
  • Off-site application delivered consistent quality and accuracy

Results Achieved

  • Seamless integration with existing ACM panels
  • Long-lasting, weather-resistant finish designed for airport conditions
  • Delivered on time and to strict project specifications